🔬Stimulation

Formation Damage

Formation damage reduces connectivity between the reservoir and the well. It can originate during drilling, completion, cementing or production. Correction through chemical stimulation is less costly and faster than mechanical workover.

Common Symptoms

  • High positive skin in pressure tests (BU/PTA)
  • Productivity reduction post-drilling or post-completion
  • Production decline after cementing or stimulation operations
  • Emulsion blockage in the near-wellbore zone
  • Invasion of drilling solids into the formation
  • Oil permeability reduction due to aqueous fluid invasion

⚠Operational Consequences

  • Underutilization of the reservoir's productive potential
  • Need for frequent and costly workovers
  • Accelerated production decline in early well life stages
  • Increase in artificial lift costs
  • Premature abandonment of economically viable wells

Recommended Solutions

  • Mutual solvent treatment to remove blocking emulsions
  • Surfactant stimulation to restore rock wettability
  • Relative permeability modification to reduce water invasion
  • Treatment design based on mineralogy and damage composition
  • PI monitoring pre and post-treatment to validate effectiveness

Do you have this problem?

Design a specific solution for your operation

An INTERFORTE specialist will analyze your case and present a personalized technical proposal.

You can also consult our team directly at contact

AI Assistant

Technical advisor

What problem do you want to solve?

Select the option closest to your current situation.